|
No. |
NAME OF
WORKS |
YEAR |
|
INDUSTRIAL MACHINERY |
|
1 |
Designing &
installing Refrigeration system for Animal - Sea-product processing: Air
blast Freezer, Cold storage, Ice-making machine |
1992-1994 |
|
2 |
Installing Central
Air Conditioning System for Russian
Consulate in Danang City |
1992 |
|
3 |
Designing,
manufacturing and installing refrigeration system
Danang Brewery
Factory – DAVINA |
1994 |
|
4 |
Designing and
manufacturing refrigeration system 460,000 kcal/g – Danang Brewery
Factory. |
1994 |
|
5 |
Installing Boiler,
steam distribution, condensate recovery, deaeration, air compressed,
refrigeration system - Reynolds Danang JVC Ltd. |
1996 - 1997 |
|
6 |
Designing and
installing Coldstorage 100 tons – Dong An Co.Ltd – Hoi An Quang Nam |
2001 |
|
7 |
Supplying and
installing Air blast Freezer 500 kgs/shift, Cold storage 200 tons,
Ice-making machine 10 tons/day – Viet Trung Co.Ltd – Hai Phong |
2001 |
|
8 |
Supplying and
installing Air blast Freezer, Cold storage 100 tons, Ice-making machine
5 tons/day – Hai Ha Co.Ltd. |
2000-2001 |
|
9 |
Designing and
manufacturing Refrigeration system, Cold storage, Ice-making machine –
Viet Truong Sea Product Processing Co. – Hai Phong. |
2002 |
|
10 |
Designing and
manufacturing Refrigeration system, Cold storage, Ice-making machine –
ALPHASEACO – Dien Nam, Dien Ngoc |
2000-2001 |
|
11 |
Designing and
manufacturing the Soap powder drying system (used DO) – Danang chemical
Industrial Co. |
1993-1994 |
|
12 |
Designing,
manufacturing and installing brewery filtering system 10 million
litres/year. Thanh Hoa Brewery Factory |
1994 |
|
13 |
Designing,
improving and recovering Pasteuriser 10 million litres/year Thanh Hoa
Brewery Factory |
1994-1995 |
|
14 |
Designing,
manufacturing and installing the grains storage and transfer line –
Danang Brewery Co. |
1995 |
|
15 |
Installing Boiler,
steam distribution, condensate recovery, deaeration system - Danang
Brewery Co |
1995 |
|
16 |
Designing The Phu
Yen tapioca starch processing plant |
1998 |
|
17 |
Designing,
manufacturing and installing the condensate recovery system – Danang
Brewery Co. |
1995 |
|
18 |
Team Distribution
System 4 tons/h – Son Tra Woven and Dyed Factory- Hoa Khanh, Danang |
2003-2004 |
|
19 |
Designing,
manufacturing and installing the CO2 purification system and reaction
tank – Coca Cola Danang |
1996 |
|
20 |
Manufacturing the
CO2 purification system Tay Do beverage Co. |
1998-1999 |
|
21 |
Manufacturing,
installing Gas-Oil-Compressed air Distribution system - Danang Glass
Factory |
1996 |
|
22 |
Manufacturing,
installing the sand refinery system - Danang Glass Factory |
1996 |
|
23 |
Installing the
Hospital Elevator 100 kgs - Quang Ngai Hospital |
1996-2000 |
|
24 |
Manufacturing,
installing TOD, TBF and Pipe system
Danang Brewery Co. |
1997 |
|
25 |
Manufacturing the
reaction tank of industrial water system - Tay Do beverage Co. |
1998-1999 |
|
26 |
Installing the
technological pipe system of FOSTER Brewery, Tien Giang province. |
2003 |
|
27 |
Designing The Phu
Yen tapioca starch processing plant |
1998 |
|
28 |
Designing The
Danang bicycle manufacturing plant |
1998 |
|
29 |
Designing The
Danang fan manufacturing plant |
1998 |
|
30 |
Designing The
bacterial fertilizer plant |
1998 |
|
31 |
Designing the
Iodine production line
Quang Ngai medical
material Co. |
1999 |
|
32 |
Designing Steel
structure producing Factory of Electrical Building and Installing
Co.III - Danang |
2000 |
|
33 |
Designing,
manufacturing and installing The malt – rice grinding House – Danang
Brewery Co. |
1995 |
|
34 |
Designing,
installing the processing line of Thuan Phat Food factory – Le Minh Xuan
IZ |
2000 |
|
35 |
Designing,
installing the shrimp food producing line |
2000 |
|
36 |
Designing,
installing the soft plank factory – Corimex Phu Yen |
2001 |
|
37 |
Overhauling the
chimney system of HOLCIM cement plant – Kien Giang province. |
2003 |
|
38 |
Designing and
manufacturing the Clape mechnical valved door system, opened and closed
equipment, power transmission and electrical control system of the
works at Thao Long, Hue. |
2003 |
|
39 |
Designing,
supplying and installing thermoelectric station
Song Hinh town, Phu
Yen |
1994 |
|
40 |
Installing the
power transmission system
Tra dong – Tra
duong, Tra my district, Quang Nam |
1998 |
|
41 |
Installing the
power transmission system
North-south street
Danang City |
1998 |
|
42 |
Supplying
electricity – Technical infrastructure projects of Danang II Post and
Communication technical College. |
2002 |
|
43 |
Designing the light
and power electricity system of SaiGon-DungQuat sub-industrial Zone,
QuangNgai province. |
2003-2004 |
|
WATER SUPPLYING |
|
1 |
Designing,
manufacturing, installing the water treatment system –Thanh Hoa brewery
Co. |
1994 |
|
2 |
Designing,
manufacturing, installing the water treatment system –Danang brewery Co. |
1995 |
|
3 |
Designing,
manufacturing, installing the water treatment system –Huu Nghi Co. |
1997 |
|
4 |
Designing,
installing the swimming-pool water treatment system
The 3rd
National Sporting Training Center |
1997-1998 |
|
5 |
Installing the
boiler, steam distribution system
Phu Yen topioca
starch processing plant |
1999 |
|
6 |
Designing and
installing the water treatment system-Cantho beverage Co. |
1998-1999 |
|
7 |
Installing the
water treatment system 6000 m3/day
Dien nam – Dien
ngoc IZ |
1999-2000 |
|
8 |
Installing the
water supplying system 6000 m3/day
Quang Ngai town |
2000-2001 |
|
9 |
Installing the
water supplying system-LienChieu Industrial Zone, Danang |
2002-2003 |
|
10 |
Manufacturing and
installing the water suppling system of Quangnam Brewery Co. |
2004 |